ISRO

The third and final orbit raising operation of GSAT-17 Satellite has been successfully carried out by LAM Engine firing for 492 sec from 08:51 hr IST on July 02, 2017

Orbit Determination results from this LAM firing are:

  • apogee X perigee height was changed to 35813 km X 35447 km.
  • Inclination is 0.088 deg.
  • Orbital period is 23hr 48 min.

More ...